Crack map
Mark every new crack and say whether a pipe passes behind it.
Wigan was built over coal, and the ground still moves a little. Pipes laid straight can end up under strain, drains settle and houses that have been altered many times carry plumbing from every decade side by side.
Streets built over old workings can shift by small amounts, and a rigid pipe fixed at two points may be pulled at a joint. The sign is often a door that sticks, a crack that follows a pipe route or a floor that has dipped. Say whether any cracks have appeared recently, whether doors have begun to catch, where pipes run in relation to those cracks, whether any joint has been repaired more than once and which fitting weeps. Add the approximate age of the house, because a street laid on mining ground in the 1900s has seen more movement than one laid in the 1960s.
Mill-conversion flats beside the canal were fitted with new plumbing inside old walls and floors, and risers sometimes serve several homes. A drip in one flat may start in another. Note your floor, the neighbours above and below, the position of the riser cupboard, the keyholder, any managing agent and any stain on a ceiling beneath you. If the building's water was worked on lately, note when, because a drained system can leave air and loosened scale behind it.
Wigan plumbing work includes joints that weep after the ground has shifted, pipes that rub where they pass through joists, stained ceilings below bathrooms and runs that were altered without being re-clipped. A reader helps by saying where a crack, a stain and a pipe lie in relation to each other, because the three together usually point to the cause.
Turn off the stopcock to see whether a stain stops growing, and slip a sheet of kitchen paper under any joint within reach. Photograph cracks beside a ruler, with the date pencilled on the wall. Do not lean on exposed pipe, do not wrap a weeping joint and forget it and do not pour caustic cleaners into a drain that has slowed after heavy rain.
Mark every new crack and say whether a pipe passes behind it.
Note any door that has begun to stick and in which room.
Flat-dwellers should ask who keeps the riser cupboard key.
List any joint that has been mended more than once.
In a terrace on former mining ground a bathroom door has begun to catch, a hairline crack runs down the wall behind the basin and the joint at the basin tap weeps. The householder pencils the date beside the crack, photographs it with a ruler, shuts the stopcock and sees the weep stop, and recalls that the same joint was remade two years ago. A reader sees a pipe under strain from a settling wall, not simply a worn joint.
Cracks and sticking doors. Date each crack.
Shared risers. Ask above and below.
Mixed pipework. List past repairs.
A slow sinking or shifting of ground, often over old mine workings, that can strain a building and its pipes.
A tall pipe or duct that feeds water to each storey of a block.
A little bracket that keeps a pipe fastened to a wall or joist.
Often. Date the crack, photograph it and shut the water to see whether the weep stops.
Something may be pulling on it; list the repairs and any new cracks nearby.
That depends on where the pipe fails, so record the stain and ask the manager.
Please not; forcing a pipe can break the joint. Photograph how it sits.
A typed answer; attendance follows only a quote that you have approved.
Date and photograph every crack, shut the stopcock to test the weep, ask above and below in a flat, and then set your Wigan plumbing details before Repairco.
Submitting a repair enquiry does not confirm an appointment or payment.